news

July 2016. Images of the evolution of the cover of the new football stadium for Club Atlético de Madrid (Wanda Metropolitano)

We are publishing more technical images on the new cover of the stadium of Atlético de Madrid.

1. A flat of 32 modules cover compression ring division.

2. Pads for the temporary support of roof modules in the surroundings of the stadium have been built.

3. Temporary structures are built on the pads to position the structure in precise inclination.

4. Three of the modules of the front opposite the have already been assembled , the fourth is in process.

5. Different metal beams are lifted by cranes and then screwed between them to form a stable structure.

6. Assembled frame.

Loading...