Faculty of Sciences of Education for US University, Seville

PROJECT REPORT

The need to host a multi-purpose program and to offer the most appropriate specificity and dimension to each of the uses, has generated the two superimposed layouts that organize the structure of the new building. On one hand, two four-storied buildings that have a cross-span of 19,50 metres spread along the longest side of the building site. The most representative uses are carried out there, the disposition of the classrooms creating a landscaped patio. Superimposed on this structure, there is a more arbitrary, two-storied structure with a 10-metres cross-span. The departments are situated in this other structure, which generates a shading element above the patio. The façade is continuous and is covered with a single material, thus providing unity to the whole.

An easily-recognizable cross section and varied, volumetric features endow the building with a very singular character in consonance with its function as a public building and differentiate it from the neighbouring residential buildings.

Besides allowing a differentiated use, the contrasting disposition of the accesses generates a sort of diagonal tension among them that favours inside movement through the garden. Thus, the central patio turns into the bonding nexus and “heart” of the building.

MAIN DATA

Client: US University
Address: C/ Pirotecnia s/n. 41013 Seville, Spain
Typology: Education & Culture
Status: Built

DATES

Competition: 2006
Design of project: 2006 - 2007
Construction: 2007 - 2010 -2017
Implementation: 2010

SURFACES
Solar: : 5.407 m²
Main building: 27.757 m²
Other spaces: 1.260 m²
Total: 29.017 m²

TECHNICAL TEAM
Architects:

Cruz y Ortiz Arquitectos

Collaborators:

Alejandro Álvarez, Blanca Sánchez, Guillermo Torres, Iván Saldarreaga, Margarita Zoido, Óscar García de la Cámara

Infography:

Cruz y Ortiz Arquitectos

Model:

Queipo Maquetas

Photography:

Fotowork, Fotowork (model), Pedro Pegenaute

Structural engineering:

Calconsa XXI S.L.U.

Climate engineering:

Electroansa, Tecysu

Survey:

Cruz y Ortiz Arquitectos

Site control:

Análisis de Edificación y Construcción

Contractors:

Brues y Fernández Construcciones, GESAI