The project aims to provide a certain uniqueness and public character to the future headquarters of two government ministries, without lessening the required functional efficiency of a standard office building.
A homogeneous open hall of 12.40 metres, without intermediate columns, ideal for an administrative use, gives shape to the building bodies of eight intertwined floors, creating a singular figure. The building, which extends out to the perimeter of the site, defines the alignments of the streets without prejudicing neighbouring buildings.
The long perimeter lighting constitutes a continuous and modulated facade that, when folded, creates open and wooded spaces with masses of citrus trees. Above the eight floors a pitched roof provides space for the installations. The changing profile and volumes should give the building a uniqueness appropriate for its public nature.
The 12.40 m width of the open hall allows for the inclusion of both modular offices and offices open to one side and the other of a central circulation. Each floor can be flexibly organized. The fixed cores are positioned at the intersection of the elements, thereby absorbing the geometrical irregularities at the crossings of the different alignments. At these points are placed the cores of vertical circulation, the toilets and a meeting room. Circulations will be continuous and focused on the work areas. The layout of offices and open work areas will be arranged flexibly depending on the needs of each service or of each momentin the life of the building.
Client:
Ministry of Economy and Finance of the Andalusian Government
Address:
C/ Pablo Picasso, 1. Seville, Spain.
Typology:
Offices
Status:
Built
Competition:
2005
Design of project:
2005-2008
Construction:
2009-2015
Implementation:
2016
Cruz y Ortiz Arquitectos
Collaborators:Alejandro Álvarez, Blanca Sánchez, Daniel Rodríguez, Guillermo Torres, H. Salcedo, José Ortiz, Miguel Velasco, Rocío de Vicente, Rodrigo Ruiz
Lightning design:JG Ingenieros
Landscape:Cruz y Ortiz Arquitectos, LOCAL 4
Infography:Cruz y Ortiz Arquitectos
Model:Queipo Maquetas
Photography:Cruz y Ortiz Arquitectos, Fotowork (model), Pedro Pegenaute
Structural engineering:Tedeco Ingenieros
Climate engineering:JG Ingenieros
Fire safety specialist:Ingeseg
Health and safety planning:Cemosa
Survey:Cruz y Ortiz Arquitectos
Site control:Análisis de Edificación y Construcción
Contractors:UTE 'Edificio Picasso' (PRINUR + URINCI)
Cookies required for the proper functioning of the site. These cookies ensure basic and security functionalities. They do not store any personal information.
Analytics cookies are used for the author of the page to identify human traffic interacting with his website, such as visitor metrics, bounce rate, source of traffic ... No personal data are collected except those identifying your sex and age range.
Cookie | Type | Duration | Description |
---|---|---|---|
_ga | 0 | 2 years | This cookie is installed by Google Analytics. The cookie is used to calculate visitor, session and campaign data and track site usage for site analytics report. Cookies store information anonymously and assign a randomly generated number to identify unique visitors. |
_gid | 0 | 1 day | This cookie is installed by Google Analytics. The cookie is used to store information about how visitors use a website and helps create an analytical report on how the website works. The data collected, including the number of visitors, the source they came from and the pages, appear anonymously. |
_gat | 0 | 1 minute | Google Universal Analytics installs these cookies to limit the request speed and limit data collection on high-traffic sites. |